JOB ORDER CONTRACTING PROGRAM FORUM
The County of Solano invites you to attend a Job Order Contracting Program Forum to be held on Monday, June 11, 2012 from 4 p.m. till 6 p.m. at the County Events Center located at 601 Texas Street, Fairfield, California. Please see the attached flyer for additional information. Please feel free to download the attached flyer and distribute it to other interested parties.
The forum is being held to inform local general building contractors, sub-contractors, construction trades, suppliers, professional architectural/engineering consultants and all other interested parties of construction-related projects opportunities within County-occupied facilities under the County's Job Order Contracting Program and for other projects issued for bid separately. The forum will provide an opportunity for networking, registering your firm with the County to be apprised of future business opportunities, and to learn more about doing business with the County.
For more information about the forum, please call Rosa Lane at (707) 784-7908. For more information about Job Order Contracting, please visit www.gordian-group.com.
Solano County Local Forum (flyer)
NOTICE TO BIDDERS
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, will receive bids in accordance to Notice to Bidders for the furnishing of all labor, materials, transportation, and services necessary for the completion of:
CLAYBANK ADULT DETENTION FACILITY
Fairfield, Solano County, California
Resource Documents:
hBT Asbestos Survey 12-13-06
HBT Lead Survey 12-13-06
Miller Pacific GeoTech Report 12-17-10
Miller Pacific- Pavt Section Alternates 07-14-11
Project Labor Agreement (PLA)
(Additional information regarding the PLA will be provided via addendum)
Topographic Map
Notice to Bidders
SEALED BIDS DUE: May 16, 2012 (2:00pm, local time)
Solano County, Division of Architectural Services
675 Texas Street, Suite 2500
Fairfield, CA 94533
NOTICE TO BIDDERS
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, will receive bids in accordance to Notice to Bidders for the furnishing of all labor, materials, transportation, and services necessary for work issued under:
Job Order Contract: 2012-01 and 2012-02
Solano County, California
Bid Result: JOC 2012-01
Bid Result: JOC 2012-02
Mandatory Pre-Bid Attendees
Notice to Bidders
SEALED BIDS DUE: April 4, 2012 (2:00pm, local time)
Solano County, Division of Architectural Services
675 Texas Street, Suite 2500
Fairfield, CA 94533
APPLICATION FOR PREQUALIFICATION OF SECURITY ELECTRONICS SUB-CONTRACTORS
CLAYBANK ADULT DETENTION FACILITY PROJECT
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, is pre-qualifying security electronics sub-contractors for construction of the new Claybank Adult Detention Facility Project ("Project"). A new state-of-the-art, podular, 362-bed adult detention facility located at 2500 Claybank Road in Fairfield, California to be specifically used for housing of individuals who are post-arraigned and pre-sentenced. The project will be administered under a Project Labor Agreement (PLA) between the County of Solano, the Napa-Solano Building Trades Council and applicable trades.
Response to Request for Information (RFIs)
PreQualification Application
Voluntary Pre-Submittal Conference:
January 13, 2012, 10:00am (Local Time) - (date revised on 01/05/12)
2500 Claybank Road
Fairfield, CA 94533
(Sheriff's Office Training Trailer)
Applications for Prequalification Due Date:
January 27, 2012, 5:00pm (Local Time)
APPLICATION FOR PREQUALIFICATION OF GENERAL BUILDING CONTRACTORS
CLAYBANK ADULT DETENTION FACILITY PROJECT
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, is pre-qualifying general building contractors for construction of the new Claybank Adult Detention Facility Project ("Project"). A new state-of-the-art, podular, 362-bed adult detention facility located at 2500 Claybank Road in Fairfield, California to be specifically used for housing of individuals who are post-arraigned and pre-sentenced. The project will be administered under a Project Labor Agreement (PLA) between the County of Solano, the Napa-Solano Building Trades Council and applicable trades.
Notice - Application for Prequalification of General Building Contractors
PreQualification Application
Response to Request for Information
Mandatory Pre-Submittal Conference:
Pre-Submittal Conference - Presentation
Pre-Submittal Conference - Sign-In Sheet
Applications for Prequalification Due Date:
December 22, 2011, 5:00pm (Local Time)
EXISTING CLAYBANK ADULT DETENTION FACILITY SECURITY ELECTRONICS UPGRADE PROJECT
Notice of Intent to Award Contract to:
SIERRA DETENTION SYSTEMS
SIERRA DETENTION SYSTEMS - SUBCONTRACTOR'S LIST
BID TABULATION
NOTICE IS GIVEN THAT SOLANO COUNTY, CALIFORNIA, will receive bids for the furnishings of all labor, materials, transportation, and services necessary for the completion of the project.
Only Pre-qualified General Building Contractors who have been specifically pre-qualified by the County for this project can submit bids (Roebbelen, Sierra Detention Systems, Legg Inc., and Arntz Builders, Inc.). All sub-contractors, supplies and vendors are to contact the listed General Buildings Contractors for interest in bidding on this Project.
ADDENDUM NO. 2
ADDENDUM NO. 1
Addenda No. 1 and 2 are being issued to the Contract Bid Documents for the above referenced project.
Acknowledgment of receipt of these ADDENDA are required on the Bid Form. Failure to do so may cause rejection of your bid as being non-responsive.
SEALED BIDS DUE:
NOVEMBER 1, 2011, 2:00 PM (D.S.T.) at the
Solano County, Division of Architectural Services
675 Texas Street, Suite 2500
Fairfield, CA 94533
PUBLIC ART COMMITEE MEETING
Pre-proposal Conference Meeting (June 15, 2011) - PowerPoint Presentation
SOLANO COUNTY 5-YEAR CAPITAL FACILITIES IMPROVEMENT PLAN
The Solano County 5-Year Capital Facilities Improvement Plan Fiscal Year 2011/12 - 2015/16 was approved by the Board of Supervisors on February 28, 2012. Select the link below to view the document. This document is large so please consider the environment before printing.
Capital Facilities Improvement Plan - FY 11/12 to FY 15/16
This page was last updated on 05/17/12.
|
| | | |